The BEIRUT EASTERN MARINA project consisted of the excavation of the inner marina to the level of -5.0 MSL, the dredging of the outer basin to the level of -9.0 MSL, dredging under the northern revetment and main breakwater to the level of -25.0 MSL to remove the unsuitable material and replace it with quarry run, executing the main breakwater by installing rock layers and 12-m3 accropode units, the installation of rocks at the edges of the inner marina, the execution of the infrastructure networks, intake pile line and flushing system, and supplying and installing wooden cribs at the entrance of the marina.
Location
Beirut Central District
Execution Date
07/04/2020
Employer
Solidere
ENGINEER
Dar Al Handasah Chair & Partners