The NEW WATERFRONT OF BEIRUT project entailed the execution of more than 8 km of roads with the associated infrastructure networks. The work included excavation and cartaway, a sewage network, storm box culverts, water supply, irrigation, fire-fighting systems, low-voltage and medium-voltage networks, road works, in-situ casting of concrete sidewalks, decorative street lighting poles and luminaires, and traffic lights.
Location
Beirut Central District
Execution Date
01/07/2016
Employer
Solidere
ENGINEER
Laceco