Primer's work for the PORT OF TRIPOLI SPECIAL ECONOMIC ZONE consists of the geotechnical underwater investigation study, the removal of the unsuitable soil and mud by using off-shore equipment and long-reach excavators, land reclamation of an area of 500,000 m2 to the level of +1.5 MSL, and the execution of the breakwater protection with a length of 650 m.
Location
Port of Tripoli City
Execution Date
07/08/2019
Employer
CDR
ENGINEER
Rafik El Khouri
Our Subsidiaries







