The REHABILITATION OF DBAYEH ROAD consisted of the removal of debris and soil materials resulting from the road's collapse, executing the revetment with the toe along the length of the road by supplying and installing 0.5 to 15-ton rocks and 16-m3 concrete Accropode units above and below the water in order to widen the protection and ensure the safety of the road, rehabilitation of the sidewalks and installation of new urban furniture, laying new layers of asphalt, installing cat eyes and road markings, and supplying and installing street lighting.
Location
Dbayeh
Execution Date
02/08/2019
Employer
Ministry of Public Works
ENGINEER
SEATEC